Saturday, November 9, 2013

Day 20


Cornel came on Saturday to finish the tile. All the doors were locked when he got here and I was in the basement doing laundry and did not hear him knocking or ringing the doorbell. I had left the door unlocked for him but Isabel locked the door (not knowing he was coming). Cornel got a late start installing the laundry room floor. He was very gracious about the mixup.

Cornel grouting the shower floor.
I think the new laundry room (former hall closet) floor looks just like wood but it is tile!
The shower floor in the hall bathroom. 

No comments:

Post a Comment